Issue Date: May/June 2011

By

GEOSTRATA, 2011, May/June, 16-23   The Marquette Interchange project is an $810-million interchange replacement. The South Leg project portion spans the Menomonee Valley area, and contains project-wide deep organic deposits underlain by a layered profile of granular and cohesive soils. Driven closed-end steel pipe piles, representing a number of design departures from the Wisconsin Department […]

G-I/ASCE Members Only

Sign in to ASCE.org

or

Sign up for our magazine

Please enter a valid email address.

Categorized as: Geotechnics